Skip to content
Thursday, May 28, 2026
Latest:
  • MPs laud Menengai Geothermal progress, pledge support
  • Menengai tour leaves delegates impressed by GDC’s geothermal milestone
  • GDC inks three strategic deals at Geothermal Conference 2026
  • GDC Conference opens as experts back geothermal to power industrial growth
  • GDC backs Menengai youth teams with sports kits donation

The Geo Blog

Get the latest news and stories from GDC & the geothermal energy sector

  • Home
  • Latest News
  • GDC in the media
  • GDC Team
  • Geothermal Energy
  • Contributions
  • Glossary
  • Main Site

Crown block

The crown block is a fixed pulley assembly located at the top of a drilling rig. It is the stationary section of a block and tackle that contains a set of pulleys or sheaves through which the drill line (wire rope) is threaded. It is located above the travelling block. The crown block, drill line and travel block together helps lift heavy loads.

« Back to Glossary Index
  • ← Catwalk
  • Well casing →

Similar Posts

Latest News

GDC scientists honoured at GRC conference

January 16, 2018March 13, 2018gdckenya
GDC Team Latest News Women in Geothermal

Empowering Excellence: GDC Celebrates Female Scientists Breaking Barriers in STEM

February 14, 2024February 14, 2024gdckenya
Latest News

Top Baringo County Security team in praise of geothermal project, affirms support

November 27, 2018December 17, 2018gdckenya
Recent Posts
  • MPs laud Menengai Geothermal progress, pledge support
  • Menengai tour leaves delegates impressed by GDC’s geothermal milestone
  • GDC inks three strategic deals at Geothermal Conference 2026
  • GDC Conference opens as experts back geothermal to power industrial growth
  • GDC backs Menengai youth teams with sports kits donation
Copyright of Geothermal Development Company 2026