Skip to content
Tuesday, July 28, 2026
Latest:
  • Kenya’s time to star at the global geothermal stage
  • How energy forged civilization
  • Kenya bets big on geothermal future at GDC conference
  • GDC’s quest for global environmental standardization
  • France taps on GDC to unlock EA’s geothermal potential

The Geo Blog

Get the latest news and stories from GDC & the geothermal energy sector

  • Home
  • Latest News
  • GDC in the media
  • GDC Team
  • Geothermal Energy
  • Contributions
  • Glossary
  • Main Site

Crown block

The crown block is a fixed pulley assembly located at the top of a drilling rig. It is the stationary section of a block and tackle that contains a set of pulleys or sheaves through which the drill line (wire rope) is threaded. It is located above the travelling block. The crown block, drill line and travel block together helps lift heavy loads.

« Back to Glossary Index
  • ← Catwalk
  • Well casing →

Similar Posts

GDC Team

What measures GDC has taken toward environmental management in its projects? #WED

June 6, 2024August 26, 2024gdckenya
GDC Team Latest News

Interview with #GDCTeam Project Management Engineer, Moses Kachumo #CleanEnergyWeek

January 25, 2024January 25, 2024gdckenya
GDC Team Women in Geothermal

#WomenInGeothermal Yvonne Wanambiro

March 17, 2020January 14, 2021gdckenya
Recent Posts
  • Kenya’s time to star at the global geothermal stage
  • How energy forged civilization
  • Kenya bets big on geothermal future at GDC conference
  • GDC’s quest for global environmental standardization
  • France taps on GDC to unlock EA’s geothermal potential
Copyright of Geothermal Development Company 2026