Skip to content
Wednesday, November 18, 2026
Latest:
  • Au revoir, Moroni: New connections and geothermal insights from a successful ARGeo-C11
  • GDC kicks off Customer Service Week with call to go the extra mile
  • GDC off to Ethiopia as it inks well logging agreement with Shandong Kerui
  • New strategy charts Kenya’s geothermal growth to 2036
  • GDC celebrates excellence

The Geo Blog

Get the latest news and stories from GDC & the geothermal energy sector

  • Home
  • Latest News
  • GDC in the media
  • GDC Team
  • Geothermal Energy
  • Contributions
  • Glossary
  • Main Site

Crown block

The crown block is a fixed pulley assembly located at the top of a drilling rig. It is the stationary section of a block and tackle that contains a set of pulleys or sheaves through which the drill line (wire rope) is threaded. It is located above the travelling block. The crown block, drill line and travel block together helps lift heavy loads.

« Back to Glossary Index
  • ← Catwalk
  • Well casing →

Similar Posts

Blog Geothermal Energy

GDC Steam Gathering System

March 23, 2018gdckenya
Latest News

Zambia seeks collaboration with GDC in Direct Use

March 2, 2023March 2, 2023Enock Ngome
GDC Team Latest News

#IWD2024 Interview with #GDCTeam Human Resource Assistant, Regina Nkoidillah

March 8, 2024March 8, 2024gdckenya
Recent Posts
  • Au revoir, Moroni: New connections and geothermal insights from a successful ARGeo-C11
  • GDC kicks off Customer Service Week with call to go the extra mile
  • GDC off to Ethiopia as it inks well logging agreement with Shandong Kerui
  • New strategy charts Kenya’s geothermal growth to 2036
  • GDC celebrates excellence
Copyright of Geothermal Development Company 2026