Skip to content
Sunday, November 8, 2026
Latest:
  • Au revoir, Moroni: New connections and geothermal insights from a successful ARGeo-C11
  • GDC kicks off Customer Service Week with call to go the extra mile
  • GDC off to Ethiopia as it inks well logging agreement with Shandong Kerui
  • New strategy charts Kenya’s geothermal growth to 2036
  • GDC celebrates excellence

The Geo Blog

Get the latest news and stories from GDC & the geothermal energy sector

  • Home
  • Latest News
  • GDC in the media
  • GDC Team
  • Geothermal Energy
  • Contributions
  • Glossary
  • Main Site

Crown block

The crown block is a fixed pulley assembly located at the top of a drilling rig. It is the stationary section of a block and tackle that contains a set of pulleys or sheaves through which the drill line (wire rope) is threaded. It is located above the travelling block. The crown block, drill line and travel block together helps lift heavy loads.

« Back to Glossary Index
  • ← Catwalk
  • Well casing →

Similar Posts

Latest News

GDC successfully discharges the third well at the Paka Prospect

April 9, 2021April 9, 2021gdckenya
Latest News

Second rig on transit to Baringo-Silali Project

October 5, 2020October 8, 2020gdckenya
GDC Team

#GDCTeam Jeremiah Kipngok

November 12, 2020November 12, 2020gdckenya
Recent Posts
  • Au revoir, Moroni: New connections and geothermal insights from a successful ARGeo-C11
  • GDC kicks off Customer Service Week with call to go the extra mile
  • GDC off to Ethiopia as it inks well logging agreement with Shandong Kerui
  • New strategy charts Kenya’s geothermal growth to 2036
  • GDC celebrates excellence
Copyright of Geothermal Development Company 2026