Skip to content
Wednesday, June 17, 2026
Latest:
  • GDC hits 50,000 trees in Q1 restoration drive
  • MPs laud Menengai Geothermal progress, pledge support
  • Menengai tour leaves delegates impressed by GDC’s geothermal milestone
  • GDC inks three strategic deals at Geothermal Conference 2026
  • GDC Conference opens as experts back geothermal to power industrial growth

The Geo Blog

Get the latest news and stories from GDC & the geothermal energy sector

  • Home
  • Latest News
  • GDC in the media
  • GDC Team
  • Geothermal Energy
  • Contributions
  • Glossary
  • Main Site

Crown block

The crown block is a fixed pulley assembly located at the top of a drilling rig. It is the stationary section of a block and tackle that contains a set of pulleys or sheaves through which the drill line (wire rope) is threaded. It is located above the travelling block. The crown block, drill line and travel block together helps lift heavy loads.

« Back to Glossary Index
  • ← Catwalk
  • Well casing →

Similar Posts

GDC Team Latest News

Pauline and Linet Push Thtough As Safari Rally Battle Intensifies

March 14, 2026April 7, 2026gdckenya
Contributions GDC Team Steam Magazine

Called to Serve

October 13, 2020April 12, 2023gdckenya
Latest News

Regional Managers Report to New Stations

February 1, 2017March 14, 2018gdckenya
Recent Posts
  • GDC hits 50,000 trees in Q1 restoration drive
  • MPs laud Menengai Geothermal progress, pledge support
  • Menengai tour leaves delegates impressed by GDC’s geothermal milestone
  • GDC inks three strategic deals at Geothermal Conference 2026
  • GDC Conference opens as experts back geothermal to power industrial growth
Copyright of Geothermal Development Company 2026