The project is about pumping geothermal brine to the communities and farms at higher elevation over the Menengai Caldera from well MW-07 at caldera floor. Its about a geothermal brine powered pump that is manufactured locally thereby keeping its capital and maintenance costs low. The brine transported outside the caldera will promote utilization of geothermal brine and enhance socio-economic wellbeing of the targeted villages.
Fill out the form below