{"id":1999,"date":"2026-07-03T09:04:19","date_gmt":"2026-07-03T06:04:19","guid":{"rendered":"https:\/\/www.gdc.co.ke\/blog\/?p=1999"},"modified":"2026-07-03T09:04:20","modified_gmt":"2026-07-03T06:04:20","slug":"risk-governance-key-to-geothermal-success","status":"publish","type":"post","link":"https:\/\/www.gdc.co.ke\/blog\/risk-governance-key-to-geothermal-success\/","title":{"rendered":"Risk governance key to geothermal success"},"content":{"rendered":"<p class=\"wp-block-paragraph\">Geothermal energy is a strategic pillar of Kenya&rsquo;s energy future. Yet only a fraction of the country&rsquo;s vast geothermal potential has been harnessed, reflecting persistent structural, operational and financial constraints. As recognised in the National Geothermal Strategy 2026&ndash;2036, challenges such as non-cost-reflective tariffs, operational complexity, lengthy approval processes and overreliance on public financing continue to impede sector growth.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/www.gdc.co.ke\/blog\/wp-content\/uploads\/DCIM_100MEDIA_DJI0247.JPG-1024x576.jpg\" alt=\"\" class=\"wp-image-2001\" srcset=\"https:\/\/www.gdc.co.ke\/blog\/wp-content\/uploads\/DCIM_100MEDIA_DJI0247.JPG-1024x576.jpg 1024w, https:\/\/www.gdc.co.ke\/blog\/wp-content\/uploads\/DCIM_100MEDIA_DJI0247.JPG-300x169.jpg 300w, https:\/\/www.gdc.co.ke\/blog\/wp-content\/uploads\/DCIM_100MEDIA_DJI0247.JPG-768x432.jpg 768w, https:\/\/www.gdc.co.ke\/blog\/wp-content\/uploads\/DCIM_100MEDIA_DJI0247.JPG-1536x864.jpg 1536w, https:\/\/www.gdc.co.ke\/blog\/wp-content\/uploads\/DCIM_100MEDIA_DJI0247.JPG-2048x1152.jpg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\"\/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">These realities underscore a critical point: geothermal development is not merely a technical undertaking but a complex, high-risk enterprise that requires robust governance and integrated risk management systems.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">At the core of Kenya&rsquo;s geothermal risk landscape lies resource uncertainty. Exploratory <a class=\"glossaryLink\"  aria-describedby=\"tt\"  data-cmtooltip=\"&lt;div class=glossaryItemTitle&gt;Drilling&lt;\/div&gt;&lt;div class=glossaryItemBody&gt;&amp;lt;!-- wp:paragraph --&amp;gt;Drilling is the process of making a hole from the ground surface through a predetermined trajectory to a predetermined depth where a desired resource is found. The desired resource can either be oil, gas or steam.&amp;lt;br\/&amp;gt;&amp;lt;!-- \/wp:paragraph --&amp;gt;&amp;lt;!-- wp:paragraph --&amp;gt;Drilling can be done for the purposes of exploration, appraisal or development of a resource field. It is also done for well control, that is, to prevent formation fluid from getting into the well bore due to surrounding pressure. &amp;lt;br\/&amp;gt;&amp;lt;!-- \/wp:paragraph --&amp;gt;&lt;\/div&gt;\"  href=\"https:\/\/www.gdc.co.ke\/blog\/glossary\/drilling\/\"  target=\"_blank\"  data-gt-translate-attributes='[{\"attribute\":\"data-cmtooltip\", \"format\":\"html\"}]'  tabindex='0' role='link'>drilling<\/a> remains inherently speculative, with the possibility of dry wells despite encouraging geological indicators. Institutions such as the Geothermal Development Company (GDC) have played a pivotal role in mitigating this risk by absorbing early-stage exploration costs and generating reliable resource data for investors.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Nevertheless, significant technical risks remain. <a class=\"glossaryLink\"  aria-describedby=\"tt\"  data-cmtooltip=\"&lt;div class=glossaryItemTitle&gt;Drilling&lt;\/div&gt;&lt;div class=glossaryItemBody&gt;&amp;lt;!-- wp:paragraph --&amp;gt;Drilling is the process of making a hole from the ground surface through a predetermined trajectory to a predetermined depth where a desired resource is found. The desired resource can either be oil, gas or steam.&amp;lt;br\/&amp;gt;&amp;lt;!-- \/wp:paragraph --&amp;gt;&amp;lt;!-- wp:paragraph --&amp;gt;Drilling can be done for the purposes of exploration, appraisal or development of a resource field. It is also done for well control, that is, to prevent formation fluid from getting into the well bore due to surrounding pressure. &amp;lt;br\/&amp;gt;&amp;lt;!-- \/wp:paragraph --&amp;gt;&lt;\/div&gt;\"  href=\"https:\/\/www.gdc.co.ke\/blog\/glossary\/drilling\/\"  target=\"_blank\"  data-gt-translate-attributes='[{\"attribute\":\"data-cmtooltip\", \"format\":\"html\"}]'  tabindex='0' role='link'>Drilling<\/a> in high-pressure, high-temperature environments presents operational challenges, while also require strong oversight to ensure transparency, predictability and investor hard rock formations can complicate well development. Long-term risks such as reservoir decline, well degradation and the accumulation of non-condensable gases may also reduce system efficiency over time.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Environmental and social risks are equally important. Geothermal development can affect ecosystems, water resources and vegetation if not properly managed. Projects also require land acquisition and, in some instances, community resettlement. These processes often create expectations around compensation, employment, infrastructure development and benefit sharing. When poorly managed, community trust can erode, threatening project continuity and the social licence to operate.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"683\" src=\"https:\/\/www.gdc.co.ke\/blog\/wp-content\/uploads\/GRM-turning-master-valve-3-1024x683.jpg\" alt=\"\" class=\"wp-image-2002\" srcset=\"https:\/\/www.gdc.co.ke\/blog\/wp-content\/uploads\/GRM-turning-master-valve-3-1024x683.jpg 1024w, https:\/\/www.gdc.co.ke\/blog\/wp-content\/uploads\/GRM-turning-master-valve-3-300x200.jpg 300w, https:\/\/www.gdc.co.ke\/blog\/wp-content\/uploads\/GRM-turning-master-valve-3-768x512.jpg 768w, https:\/\/www.gdc.co.ke\/blog\/wp-content\/uploads\/GRM-turning-master-valve-3-1536x1024.jpg 1536w, https:\/\/www.gdc.co.ke\/blog\/wp-content\/uploads\/GRM-turning-master-valve-3-2048x1365.jpg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\"\/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Financial Governance<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Financial and governance risks further compound these challenges. Geothermal projects demand substantial upfront investment, with <a class=\"glossaryLink\"  aria-describedby=\"tt\"  data-cmtooltip=\"&lt;div class=glossaryItemTitle&gt;Drilling&lt;\/div&gt;&lt;div class=glossaryItemBody&gt;&amp;lt;!-- wp:paragraph --&amp;gt;Drilling is the process of making a hole from the ground surface through a predetermined trajectory to a predetermined depth where a desired resource is found. The desired resource can either be oil, gas or steam.&amp;lt;br\/&amp;gt;&amp;lt;!-- \/wp:paragraph --&amp;gt;&amp;lt;!-- wp:paragraph --&amp;gt;Drilling can be done for the purposes of exploration, appraisal or development of a resource field. It is also done for well control, that is, to prevent formation fluid from getting into the well bore due to surrounding pressure. &amp;lt;br\/&amp;gt;&amp;lt;!-- \/wp:paragraph --&amp;gt;&lt;\/div&gt;\"  href=\"https:\/\/www.gdc.co.ke\/blog\/glossary\/drilling\/\"  target=\"_blank\"  data-gt-translate-attributes='[{\"attribute\":\"data-cmtooltip\", \"format\":\"html\"}]'  tabindex='0' role='link'>drilling<\/a> costs stagger at about US$ 6.7 million per well. This capital intensity exposes developers to financing constraints, currency fluctuations and market uncertainties. Complex contractual arrangements, including power purchase agreements, also require strong oversight to ensure transparency, predictability and investor confidence.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Addressing this multifaceted risk environment demands an integrated internal control framework built around four pillars: technical, environmental and social, financial, and governance controls.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Addressing this multifaceted risk environment demands an integrated internal control framework. Technical controls should prioritise asset integrity through predictive maintenance and real-time monitoring.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Environmental and social controls must emphasise emissions monitoring, water management, brand and stakeholder management and structured benefit-sharing mechanisms. Financial controls should strengthen budgeting, auditing and contract management, while governance controls must promote transparency, accountability and effective decision-making.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/www.gdc.co.ke\/blog\/wp-content\/uploads\/DCIM_100MEDIA_DJI0232.JPG-1024x576.jpg\" alt=\"\" class=\"wp-image-2003\" srcset=\"https:\/\/www.gdc.co.ke\/blog\/wp-content\/uploads\/DCIM_100MEDIA_DJI0232.JPG-1024x576.jpg 1024w, https:\/\/www.gdc.co.ke\/blog\/wp-content\/uploads\/DCIM_100MEDIA_DJI0232.JPG-300x169.jpg 300w, https:\/\/www.gdc.co.ke\/blog\/wp-content\/uploads\/DCIM_100MEDIA_DJI0232.JPG-768x432.jpg 768w, https:\/\/www.gdc.co.ke\/blog\/wp-content\/uploads\/DCIM_100MEDIA_DJI0232.JPG-1536x864.jpg 1536w, https:\/\/www.gdc.co.ke\/blog\/wp-content\/uploads\/DCIM_100MEDIA_DJI0232.JPG-2048x1152.jpg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\"\/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">Ultimately, unlocking Kenya&rsquo;s geothermal potential will depend not only on resource availability or technological capability, but also on the strength of its risk governance systems. Without effective governance, the sector risks being constrained not by <a class=\"glossaryLink\"  aria-describedby=\"tt\"  data-cmtooltip=\"&lt;div class=glossaryItemTitle&gt;Geology&lt;\/div&gt;&lt;div class=glossaryItemBody&gt;&amp;lt;!-- wp:paragraph --&amp;gt;Geology is the science which deals with the physical structure and substance of the earth, its history, and the processes which act on them.&amp;lt;br\/&amp;gt;&amp;lt;!-- \/wp:paragraph --&amp;gt;&lt;\/div&gt;\"  href=\"https:\/\/www.gdc.co.ke\/blog\/glossary\/geology\/\"  target=\"_blank\"  data-gt-translate-attributes='[{\"attribute\":\"data-cmtooltip\", \"format\":\"html\"}]'  tabindex='0' role='link'>geology<\/a>, but by its ability to manage risk<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Mr. Shitsama is the General Manager, Audit and Risk at GDC<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Download your copy of the <a class=\"glossaryLink\"  aria-describedby=\"tt\"  data-cmtooltip=\"&lt;div class=glossaryItemTitle&gt;Steam&lt;\/div&gt;&lt;div class=glossaryItemBody&gt;&amp;lt;!-- wp:paragraph --&amp;gt;Steam is the vapour component of geothermal fluid that contains thermal energy.&amp;lt;br\/&amp;gt;&amp;lt;!-- \/wp:paragraph --&amp;gt;&lt;\/div&gt;\"  href=\"https:\/\/www.gdc.co.ke\/blog\/glossary\/steam\/\"  target=\"_blank\"  data-gt-translate-attributes='[{\"attribute\":\"data-cmtooltip\", \"format\":\"html\"}]'  tabindex='0' role='link'>Steam<\/a> Magazine Issue 18 here: &nbsp;<a href=\"https:\/\/www.gdc.co.ke\/wp-content\/uploads\/2026\/06\/Steam-Magazine-Issue-18.pdf\">https:\/\/www.gdc.co.ke\/wp-content\/uploads\/2026\/06\/Steam-Magazine-Issue-18.pdf<\/a><\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Geothermal energy is a strategic pillar of Kenya&rsquo;s energy future. Yet only a fraction of the country&rsquo;s vast geothermal potential has been harnessed, reflecting persistent [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":2000,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1,181],"tags":[10,100],"class_list":["post-1999","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-steam","tag-gdc","tag-geothermal-development-company"],"_links":{"self":[{"href":"https:\/\/www.gdc.co.ke\/blog\/wp-json\/wp\/v2\/posts\/1999","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.gdc.co.ke\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.gdc.co.ke\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.gdc.co.ke\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.gdc.co.ke\/blog\/wp-json\/wp\/v2\/comments?post=1999"}],"version-history":[{"count":1,"href":"https:\/\/www.gdc.co.ke\/blog\/wp-json\/wp\/v2\/posts\/1999\/revisions"}],"predecessor-version":[{"id":2004,"href":"https:\/\/www.gdc.co.ke\/blog\/wp-json\/wp\/v2\/posts\/1999\/revisions\/2004"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.gdc.co.ke\/blog\/wp-json\/wp\/v2\/media\/2000"}],"wp:attachment":[{"href":"https:\/\/www.gdc.co.ke\/blog\/wp-json\/wp\/v2\/media?parent=1999"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.gdc.co.ke\/blog\/wp-json\/wp\/v2\/categories?post=1999"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.gdc.co.ke\/blog\/wp-json\/wp\/v2\/tags?post=1999"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}