{"id":1164,"date":"2022-02-11T13:26:31","date_gmt":"2022-02-11T10:26:31","guid":{"rendered":"https:\/\/www.gdc.co.ke\/blog\/?p=1164"},"modified":"2022-02-11T13:26:31","modified_gmt":"2022-02-11T10:26:31","slug":"directional-drilling-kicks-off-in-paka-prospect","status":"publish","type":"post","link":"https:\/\/www.gdc.co.ke\/blog\/directional-drilling-kicks-off-in-paka-prospect\/","title":{"rendered":"Directional Drilling kicks off in Paka Prospect"},"content":{"rendered":"<p>The <a class=\"glossaryLink\"  aria-describedby=\"tt\"  data-cmtooltip=\"&lt;div class=glossaryItemTitle&gt;Drilling&lt;\/div&gt;&lt;div class=glossaryItemBody&gt;&amp;lt;!-- wp:paragraph --&amp;gt;Drilling is the process of making a hole from the ground surface through a predetermined trajectory to a predetermined depth where a desired resource is found. The desired resource can either be oil, gas or steam.&amp;lt;br\/&amp;gt;&amp;lt;!-- \/wp:paragraph --&amp;gt;&amp;lt;!-- wp:paragraph --&amp;gt;Drilling can be done for the purposes of exploration, appraisal or development of a resource field. It is also done for well control, that is, to prevent formation fluid from getting into the well bore due to surrounding pressure. &amp;lt;br\/&amp;gt;&amp;lt;!-- \/wp:paragraph --&amp;gt;&lt;\/div&gt;\"  href=\"https:\/\/www.gdc.co.ke\/blog\/glossary\/drilling\/\"  target=\"_blank\"  data-gt-translate-attributes='[{\"attribute\":\"data-cmtooltip\", \"format\":\"html\"}]'  tabindex='0' role='link'>drilling<\/a> of the first directional well in the Paka Prospect commenced on Monday, January 17, 2022.<\/p>\n\n\n\n<p>The well, christened Paka Well 3 A (PW-03A), is the first well in the production <a class=\"glossaryLink\"  aria-describedby=\"tt\"  data-cmtooltip=\"&lt;div class=glossaryItemTitle&gt;Drilling&lt;\/div&gt;&lt;div class=glossaryItemBody&gt;&amp;lt;!-- wp:paragraph --&amp;gt;Drilling is the process of making a hole from the ground surface through a predetermined trajectory to a predetermined depth where a desired resource is found. The desired resource can either be oil, gas or steam.&amp;lt;br\/&amp;gt;&amp;lt;!-- \/wp:paragraph --&amp;gt;&amp;lt;!-- wp:paragraph --&amp;gt;Drilling can be done for the purposes of exploration, appraisal or development of a resource field. It is also done for well control, that is, to prevent formation fluid from getting into the well bore due to surrounding pressure. &amp;lt;br\/&amp;gt;&amp;lt;!-- \/wp:paragraph --&amp;gt;&lt;\/div&gt;\"  href=\"https:\/\/www.gdc.co.ke\/blog\/glossary\/drilling\/\"  target=\"_blank\"  data-gt-translate-attributes='[{\"attribute\":\"data-cmtooltip\", \"format\":\"html\"}]'  tabindex='0' role='link'>drilling<\/a> phase within the <a href=\"https:\/\/www.gdc.co.ke\/baringo.html\">Baringo-Silali Geothermal Project<\/a>. PW-03A is undergoing development on the same PW-03, which was drilled during the exploration phase.<\/p>\n\n\n\n<p>The commencement of <a class=\"glossaryLink\"  aria-describedby=\"tt\"  data-cmtooltip=\"&lt;div class=glossaryItemTitle&gt;Drilling&lt;\/div&gt;&lt;div class=glossaryItemBody&gt;&amp;lt;!-- wp:paragraph --&amp;gt;Drilling is the process of making a hole from the ground surface through a predetermined trajectory to a predetermined depth where a desired resource is found. The desired resource can either be oil, gas or steam.&amp;lt;br\/&amp;gt;&amp;lt;!-- \/wp:paragraph --&amp;gt;&amp;lt;!-- wp:paragraph --&amp;gt;Drilling can be done for the purposes of exploration, appraisal or development of a resource field. It is also done for well control, that is, to prevent formation fluid from getting into the well bore due to surrounding pressure. &amp;lt;br\/&amp;gt;&amp;lt;!-- \/wp:paragraph --&amp;gt;&lt;\/div&gt;\"  href=\"https:\/\/www.gdc.co.ke\/blog\/glossary\/drilling\/\"  target=\"_blank\"  data-gt-translate-attributes='[{\"attribute\":\"data-cmtooltip\", \"format\":\"html\"}]'  tabindex='0' role='link'>drilling<\/a> comes after the successful rig move and eventual rig up from Korosi Well 3 (KW-03) to the current location (PW-03) by the <a class=\"glossaryLink\"  aria-describedby=\"tt\"  data-cmtooltip=\"&lt;div class=glossaryItemTitle&gt;Drilling&lt;\/div&gt;&lt;div class=glossaryItemBody&gt;&amp;lt;!-- wp:paragraph --&amp;gt;Drilling is the process of making a hole from the ground surface through a predetermined trajectory to a predetermined depth where a desired resource is found. The desired resource can either be oil, gas or steam.&amp;lt;br\/&amp;gt;&amp;lt;!-- \/wp:paragraph --&amp;gt;&amp;lt;!-- wp:paragraph --&amp;gt;Drilling can be done for the purposes of exploration, appraisal or development of a resource field. It is also done for well control, that is, to prevent formation fluid from getting into the well bore due to surrounding pressure. &amp;lt;br\/&amp;gt;&amp;lt;!-- \/wp:paragraph --&amp;gt;&lt;\/div&gt;\"  href=\"https:\/\/www.gdc.co.ke\/blog\/glossary\/drilling\/\"  target=\"_blank\"  data-gt-translate-attributes='[{\"attribute\":\"data-cmtooltip\", \"format\":\"html\"}]'  tabindex='0' role='link'>Drilling<\/a> Planning and Logistics, <a class=\"glossaryLink\"  aria-describedby=\"tt\"  data-cmtooltip=\"&lt;div class=glossaryItemTitle&gt;Drilling&lt;\/div&gt;&lt;div class=glossaryItemBody&gt;&amp;lt;!-- wp:paragraph --&amp;gt;Drilling is the process of making a hole from the ground surface through a predetermined trajectory to a predetermined depth where a desired resource is found. The desired resource can either be oil, gas or steam.&amp;lt;br\/&amp;gt;&amp;lt;!-- \/wp:paragraph --&amp;gt;&amp;lt;!-- wp:paragraph --&amp;gt;Drilling can be done for the purposes of exploration, appraisal or development of a resource field. It is also done for well control, that is, to prevent formation fluid from getting into the well bore due to surrounding pressure. &amp;lt;br\/&amp;gt;&amp;lt;!-- \/wp:paragraph --&amp;gt;&lt;\/div&gt;\"  href=\"https:\/\/www.gdc.co.ke\/blog\/glossary\/drilling\/\"  target=\"_blank\"  data-gt-translate-attributes='[{\"attribute\":\"data-cmtooltip\", \"format\":\"html\"}]'  tabindex='0' role='link'>Drilling<\/a> Operations and <a class=\"glossaryLink\"  aria-describedby=\"tt\"  data-cmtooltip=\"&lt;div class=glossaryItemTitle&gt;Drilling&lt;\/div&gt;&lt;div class=glossaryItemBody&gt;&amp;lt;!-- wp:paragraph --&amp;gt;Drilling is the process of making a hole from the ground surface through a predetermined trajectory to a predetermined depth where a desired resource is found. The desired resource can either be oil, gas or steam.&amp;lt;br\/&amp;gt;&amp;lt;!-- \/wp:paragraph --&amp;gt;&amp;lt;!-- wp:paragraph --&amp;gt;Drilling can be done for the purposes of exploration, appraisal or development of a resource field. It is also done for well control, that is, to prevent formation fluid from getting into the well bore due to surrounding pressure. &amp;lt;br\/&amp;gt;&amp;lt;!-- \/wp:paragraph --&amp;gt;&lt;\/div&gt;\"  href=\"https:\/\/www.gdc.co.ke\/blog\/glossary\/drilling\/\"  target=\"_blank\"  data-gt-translate-attributes='[{\"attribute\":\"data-cmtooltip\", \"format\":\"html\"}]'  tabindex='0' role='link'>Drilling<\/a> Equipment and Maintenance teams.<\/p>\n\n\n\n<p>&ldquo;The <a class=\"glossaryLink\"  aria-describedby=\"tt\"  data-cmtooltip=\"&lt;div class=glossaryItemTitle&gt;Drilling&lt;\/div&gt;&lt;div class=glossaryItemBody&gt;&amp;lt;!-- wp:paragraph --&amp;gt;Drilling is the process of making a hole from the ground surface through a predetermined trajectory to a predetermined depth where a desired resource is found. The desired resource can either be oil, gas or steam.&amp;lt;br\/&amp;gt;&amp;lt;!-- \/wp:paragraph --&amp;gt;&amp;lt;!-- wp:paragraph --&amp;gt;Drilling can be done for the purposes of exploration, appraisal or development of a resource field. It is also done for well control, that is, to prevent formation fluid from getting into the well bore due to surrounding pressure. &amp;lt;br\/&amp;gt;&amp;lt;!-- \/wp:paragraph --&amp;gt;&lt;\/div&gt;\"  href=\"https:\/\/www.gdc.co.ke\/blog\/glossary\/drilling\/\"  target=\"_blank\"  data-gt-translate-attributes='[{\"attribute\":\"data-cmtooltip\", \"format\":\"html\"}]'  tabindex='0' role='link'>drilling<\/a> of PW-03A is a welcome development as it adds to our portfolio of wells currently at the <a class=\"glossaryLink\"  aria-describedby=\"tt\"  data-cmtooltip=\"&lt;div class=glossaryItemTitle&gt;Drilling&lt;\/div&gt;&lt;div class=glossaryItemBody&gt;&amp;lt;!-- wp:paragraph --&amp;gt;Drilling is the process of making a hole from the ground surface through a predetermined trajectory to a predetermined depth where a desired resource is found. The desired resource can either be oil, gas or steam.&amp;lt;br\/&amp;gt;&amp;lt;!-- \/wp:paragraph --&amp;gt;&amp;lt;!-- wp:paragraph --&amp;gt;Drilling can be done for the purposes of exploration, appraisal or development of a resource field. It is also done for well control, that is, to prevent formation fluid from getting into the well bore due to surrounding pressure. &amp;lt;br\/&amp;gt;&amp;lt;!-- \/wp:paragraph --&amp;gt;&lt;\/div&gt;\"  href=\"https:\/\/www.gdc.co.ke\/blog\/glossary\/drilling\/\"  target=\"_blank\"  data-gt-translate-attributes='[{\"attribute\":\"data-cmtooltip\", \"format\":\"html\"}]'  tabindex='0' role='link'>drilling<\/a> stage in the <a href=\"https:\/\/www.gdc.co.ke\/baringo.html\">Baringo Silali Geothermal Project<\/a>, which has been confirmed scientifically as viable for production <a class=\"glossaryLink\"  aria-describedby=\"tt\"  data-cmtooltip=\"&lt;div class=glossaryItemTitle&gt;Drilling&lt;\/div&gt;&lt;div class=glossaryItemBody&gt;&amp;lt;!-- wp:paragraph --&amp;gt;Drilling is the process of making a hole from the ground surface through a predetermined trajectory to a predetermined depth where a desired resource is found. The desired resource can either be oil, gas or steam.&amp;lt;br\/&amp;gt;&amp;lt;!-- \/wp:paragraph --&amp;gt;&amp;lt;!-- wp:paragraph --&amp;gt;Drilling can be done for the purposes of exploration, appraisal or development of a resource field. It is also done for well control, that is, to prevent formation fluid from getting into the well bore due to surrounding pressure. &amp;lt;br\/&amp;gt;&amp;lt;!-- \/wp:paragraph --&amp;gt;&lt;\/div&gt;\"  href=\"https:\/\/www.gdc.co.ke\/blog\/glossary\/drilling\/\"  target=\"_blank\"  data-gt-translate-attributes='[{\"attribute\":\"data-cmtooltip\", \"format\":\"html\"}]'  tabindex='0' role='link'>drilling<\/a>,&rdquo; said Eng. Stephen Kangogo Principal Officer, <a class=\"glossaryLink\"  aria-describedby=\"tt\"  data-cmtooltip=\"&lt;div class=glossaryItemTitle&gt;Drilling&lt;\/div&gt;&lt;div class=glossaryItemBody&gt;&amp;lt;!-- wp:paragraph --&amp;gt;Drilling is the process of making a hole from the ground surface through a predetermined trajectory to a predetermined depth where a desired resource is found. The desired resource can either be oil, gas or steam.&amp;lt;br\/&amp;gt;&amp;lt;!-- \/wp:paragraph --&amp;gt;&amp;lt;!-- wp:paragraph --&amp;gt;Drilling can be done for the purposes of exploration, appraisal or development of a resource field. It is also done for well control, that is, to prevent formation fluid from getting into the well bore due to surrounding pressure. &amp;lt;br\/&amp;gt;&amp;lt;!-- \/wp:paragraph --&amp;gt;&lt;\/div&gt;\"  href=\"https:\/\/www.gdc.co.ke\/blog\/glossary\/drilling\/\"  target=\"_blank\"  data-gt-translate-attributes='[{\"attribute\":\"data-cmtooltip\", \"format\":\"html\"}]'  tabindex='0' role='link'>Drilling<\/a> Operations.<\/p>\n\n\n\n<p>The team at the <a href=\"https:\/\/www.gdc.co.ke\/baringo.html\">Baringo-Silali Geothermal Project<\/a> has drilled 3 wells in Korosi and 5 wells in Paka.<\/p>\n\n\n\n<p>GDC intends to develop 100 MW from three prospects Paka, Korosi and Silali for the first phase of the <a href=\"https:\/\/www.gdc.co.ke\/baringo.html\">Baringo-Silali Geothermal Project<\/a>. The development of the Paka prospect is now at the production <a class=\"glossaryLink\"  aria-describedby=\"tt\"  data-cmtooltip=\"&lt;div class=glossaryItemTitle&gt;Drilling&lt;\/div&gt;&lt;div class=glossaryItemBody&gt;&amp;lt;!-- wp:paragraph --&amp;gt;Drilling is the process of making a hole from the ground surface through a predetermined trajectory to a predetermined depth where a desired resource is found. The desired resource can either be oil, gas or steam.&amp;lt;br\/&amp;gt;&amp;lt;!-- \/wp:paragraph --&amp;gt;&amp;lt;!-- wp:paragraph --&amp;gt;Drilling can be done for the purposes of exploration, appraisal or development of a resource field. It is also done for well control, that is, to prevent formation fluid from getting into the well bore due to surrounding pressure. &amp;lt;br\/&amp;gt;&amp;lt;!-- \/wp:paragraph --&amp;gt;&lt;\/div&gt;\"  href=\"https:\/\/www.gdc.co.ke\/blog\/glossary\/drilling\/\"  target=\"_blank\"  data-gt-translate-attributes='[{\"attribute\":\"data-cmtooltip\", \"format\":\"html\"}]'  tabindex='0' role='link'>drilling<\/a> phase.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The <a class=\"glossaryLink\" aria-describedby=\"tt\" data-cmtooltip=\"&lt;div class=glossaryItemTitle&gt;Drilling&lt;\/div&gt;&lt;div class=glossaryItemBody&gt;&amp;lt;!-- wp:paragraph --&amp;gt;Drilling is the process of making a hole from the ground surface through a predetermined trajectory to a predetermined depth where a desired resource is found. The desired resource can either be oil, gas or steam.&amp;lt;br\/&amp;gt;&amp;lt;!-- \/wp:paragraph --&amp;gt;&amp;lt;!-- wp:paragraph --&amp;gt;Drilling can be done for the purposes of exploration, appraisal or development of a resource field. It is also done for well control, that is, to prevent formation fluid from getting into the well bore due to surrounding pressure. &amp;lt;br\/&amp;gt;&amp;lt;!-- \/wp:paragraph --&amp;gt;&lt;\/div&gt;\" href=\"https:\/\/www.gdc.co.ke\/blog\/glossary\/drilling\/\" target=\"_blank\" data-gt-translate-attributes=\"[{&quot;attribute&quot;:&quot;data-cmtooltip&quot;, &quot;format&quot;:&quot;html&quot;}]\" tabindex=\"0\" role=\"link\">drilling<\/a> of the first directional well in the Paka Prospect commenced on Monday, January 17, 2022.<\/p>\n","protected":false},"author":1,"featured_media":533,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[51,1],"tags":[79,97,100],"class_list":["post-1164","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blogs","category-news","tag-baringo-silali-geothermal-project","tag-drilling","tag-geothermal-development-company"],"_links":{"self":[{"href":"https:\/\/www.gdc.co.ke\/blog\/wp-json\/wp\/v2\/posts\/1164","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.gdc.co.ke\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.gdc.co.ke\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.gdc.co.ke\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.gdc.co.ke\/blog\/wp-json\/wp\/v2\/comments?post=1164"}],"version-history":[{"count":1,"href":"https:\/\/www.gdc.co.ke\/blog\/wp-json\/wp\/v2\/posts\/1164\/revisions"}],"predecessor-version":[{"id":1166,"href":"https:\/\/www.gdc.co.ke\/blog\/wp-json\/wp\/v2\/posts\/1164\/revisions\/1166"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.gdc.co.ke\/blog\/wp-json\/wp\/v2\/media\/533"}],"wp:attachment":[{"href":"https:\/\/www.gdc.co.ke\/blog\/wp-json\/wp\/v2\/media?parent=1164"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.gdc.co.ke\/blog\/wp-json\/wp\/v2\/categories?post=1164"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.gdc.co.ke\/blog\/wp-json\/wp\/v2\/tags?post=1164"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}